1.攪拌車(chē)發(fā)動(dòng)機啟動(dòng)后,攪拌筒應低速運行約10分鐘,以便在液壓油之前,液壓油的溫度升20°C以上。
1. After the mixer engine is started, the mixer drum should run at a low speed for about 10 minutes, so that the temperature of the hydraulic oil rises to 20 ℃ before activating the hydraulic oil ° C or above.
2.在此之前,將攪拌桶上下顛倒。
2. Before that, turn the mixing drum upside down.
6.自動(dòng)喂料攪拌機運輸的混凝土坍落度必須少為8厘米。從混凝土進(jìn)入儲罐到卸貨,溫度在高溫下不應超過(guò)2小時(shí),在陰雨天則不應超過(guò)2.5小時(shí)。
6. The slump of concrete transported by automatic feeding mixer must be at least 8 cm. From the time of concrete entering the storage tank to unloading, the temperature should not exceed 2 hours under high temperature and 2.5 hours in rainy days.
7.在從攪拌機中取出混凝土之前,應將攪拌槽以10-12 rpm的轉速旋轉1分鐘。
7. The mixing tank shall be rotated at 10-12 rpm for 1 minute before concrete is removed from the mixer.
8.混凝土攪拌機卸載汽車(chē)后,使用卡車(chē)軟管清潔進(jìn)水口,卸載料斗和卸載箱之類(lèi)的零件,以卡車(chē)車(chē)身各個(gè)部分上的灰塵和殘留混凝土。倒入攪拌桶中,注入150-。 200公升純凈水。在返回過(guò)程中,緩慢旋轉混合槽以清潔內壁,以防止殘留的爐渣粘附到混合槽壁和混合葉片上,并在重新加注之前將水排干。
8. After unloading the truck with the concrete mixer, use the truck hose to clean the water inlet, unloading hopper, unloading box and other parts to remove the dust and residual concrete on each part of the truck body. Pour into the mixing drum and add 150 -. 200 liters of purified water. During the return process, slowly rotate the mixing tank to clean the inner wall to prevent the residual slag from adhering to the mixing tank wall and mixing blades, and drain the water before refilling.
9.當混凝土攪拌車(chē)運輸混凝土時(shí),發(fā)動(dòng)機轉速應在1000-1400 rpm的范圍內,以確保發(fā)動(dòng)機的扭矩。在運輸混凝土的過(guò)程中,為了駕駛,車(chē)速不應超過(guò)40 km / h。
9. When the concrete mixer transports concrete, the engine speed should be in the range of 1000-1400rpm to ensure the maximum torque of the engine. In the process of transporting concrete, in order to drive safely, the speed should not exceed 40 km / h.
10.完成水泥攪拌車(chē)的工作后,清潔攪拌車(chē)的內部和主體,不要在攪拌車(chē)上留下任何殘留的混凝土。
10. After finishing the work of the cement mixer, clean the inside and main body of the mixer, and do not leave any residual concrete on the mixer.
1.1。在開(kāi)始攪拌機軌道之前,攪拌機鼓的操作手柄必須處于“停止”位置。
1.1。 Before starting the mixer track, the operating handle of the mixer drum must be in the "stop" position.
2.2。攪拌車(chē)啟動(dòng)發(fā)動(dòng)機后,以低速旋轉攪拌桶約10分鐘,以使液壓油溫度超過(guò)20°C,然后再開(kāi)始運行。
2.2。 After the mixer starts the engine, rotate the mixing drum at a low speed for about 10 minutes to make the hydraulic oil temperature exceed 20 ℃ ° C. Then start running again.
3.3。如果攪拌車(chē)停在室外,則在裝載前應將攪拌桶倒轉以排放水和碎屑,以確?;炷临|(zhì)量。
3.3。 If the mixer truck is parked outside, the mixing drum should be reversed to drain water and debris before loading to ensure the quality of concrete.
4.4。攪拌車(chē)運輸混凝土時(shí),必須將其牢固放置,以免因松動(dòng)滑桶,損壞行人或影響其他車(chē)輛的正常運轉而擺動(dòng)。
4.4。 When concrete is transported by mixer truck, it must be placed firmly to avoid swinging due to loosening sliding bucket, damaging pedestrians or affecting normal operation of other vehicles.
5.當攪拌車(chē)裝載混合混凝土時(shí),攪拌桶的速度為2-10 rpm。在運輸過(guò)程中,在平坦路面上攪拌桶的速度保證為2-3 rpm。在超過(guò)50的側坡上行駛和在左右搖擺較大的道路上行駛時(shí),必須在路面狀況得到改善后停止混合料灌漿并重新開(kāi)始混合料灌漿。
5. When the mixer truck loads the mixed concrete, the speed of the mixing drum is 2-10 rpm. During transportation, the speed of the mixing drum is guaranteed to be 2-3 rpm on the flat road. When driving on the side slope over 50 and on the road with large left-right swing, the mixture grouting must be stopped and restarted after the road condition is improved.
6.混凝土攪拌車(chē)運輸混凝土的時(shí)間不得超過(guò)攪拌站規定的時(shí)間。在運輸混凝土期間,請勿長(cháng)時(shí)間停止攪拌桶,以防止混凝土偏析。
6. The time of transporting concrete by concrete mixer truck shall not exceed the time specified by mixing station. During the transportation of concrete, do not stop the mixing bucket for a long time to prevent concrete segregation.
7.如果攪拌車(chē)裝滿(mǎn)混凝土,現場(chǎng)停滯時(shí)間不應超過(guò)一小時(shí)。如果超時(shí),現場(chǎng)人員將不得不及時(shí)處理。
7. If the mixer truck is full of concrete, the site dead time shall not exceed one hour. In case of overtime, the on-site personnel will have to deal with it in time.
8.攪拌車(chē)運輸的混凝土塊必須少8厘米。從混凝土進(jìn)入儲罐開(kāi)始直排出為止,在炎熱天氣下排出不應超過(guò)2小時(shí),在寒冷天氣下排出不應超過(guò)2.5小時(shí)。
8. Concrete blocks transported by mixer truck must be at least 8 cm. From the beginning of concrete entering the storage tank to discharging, the discharging time shall not exceed 2 hours in hot weather and 2.5 hours in cold weather.
9.在攪拌車(chē)彈出混凝土之前,以10-12 rpm的速度旋轉攪拌桶1分鐘,然后彈出。
9. Before the concrete is ejected by the mixer truck, rotate the mixing drum at the speed of 10-12 rpm for 1 minute, and then eject.
10.混凝土攪拌機排干車(chē)后,立即使用卡車(chē)附帶的軟管沖洗進(jìn)水口,排水料斗和排水槽,以車(chē)身上的污垢和殘留的混凝土。將150-200L的清水倒入攪拌桶中。
10. After the concrete mixer dries the truck, immediately use the hose attached to the truck to flush the water inlet, drain hopper and drain trough to remove dirt and residual concrete from the truck body. Pour 150-200l clean water into the mixing bucket.