庆阳汾良信息技术有限公司

您好,歡迎光臨萊州聚峰機械有限公司網(wǎng)站!

服務(wù)熱線(xiàn)

400-879-1999

常見(jiàn)問(wèn)題

商混攪拌站混凝土配合比怎么調整?

來(lái)源:http://m.zgclmw.com/ 時(shí)間:2021-10-22

當商混攪拌站新拌混凝土有泌水現象時(shí),應及時(shí)進(jìn)行查明原因,如果不是外加劑和膠凝材料的適應性的問(wèn)題時(shí),可以調整粗骨料的摻配比例,將級配調整到級配,切不能套用固定摻配比例.
In case of bleeding of fresh concrete in commercial concrete mixing plant, the cause shall be found out in time. If it is not the adaptability of admixtures and cementitious materials, the mixing proportion of coarse aggregate can be adjusted to the best gradation, and the fixed mixing proportion must not be applied
現場(chǎng)坍落度超出配合比設計坍落度的限制時(shí),要及時(shí)分析原因,對砂石料含水率重新進(jìn)行測定,對配合比進(jìn)行校正,如果含水量實(shí)測、計算沒(méi)有錯誤時(shí),可以將減水劑摻量增加或減少0.05~0.1%進(jìn)行調整.
When the site slump exceeds the limit of the designed slump of the mix proportion, the reason shall be analyzed in time, the water content of sand and gravel shall be measured again, and the mix proportion shall be corrected. If there is no error in the measured and calculated water content, the dosage of water reducer can be increased or reduced by 0.05 ~ 0.1%
當商混攪拌站生產(chǎn)混凝土的砂率偏大或偏小時(shí),應及時(shí)進(jìn)行查明原因,將砂率進(jìn)行適當調整,調整比例為±1%如果用上述方法并不能商混攪拌站生產(chǎn)出的混凝土的問(wèn)題時(shí),應當立即停止生產(chǎn)混凝土,并尋找的維修人員進(jìn)行維修,及時(shí)采取有效措施,避免出現其他質(zhì)量問(wèn)題.
全自動(dòng)混凝土攪拌車(chē)
When the sand rate of concrete produced by commercial mixing plant is too large or too small, the reason shall be found out in time, and the sand rate shall be properly adjusted to ± 1%. If the above methods can not solve the problem of concrete produced by commercial mixing plant, the production of concrete shall be stopped immediately, professional maintenance personnel shall be found for maintenance, and effective measures shall be taken in time, Avoid other quality problems
凝土的模板拆除順序一般是先非承重模板,然后承重模板;先側板,后底板。遵循行支后拆,先拆非承重部位,后拆承重部位以及自上而下的原則,拆模時(shí),嚴禁用大錘和撬棍硬砸硬撬。
The removal sequence of concrete formwork is generally non load-bearing formwork first, and then load-bearing formwork; First the side plate and then the bottom plate. Follow the principle of removing after supporting, removing non load-bearing parts first, and then removing load-bearing parts from top to bottom. During formwork removal, it is strictly prohibited to smash and pry with sledgehammer and crowbar.
拆模時(shí),工作人員應站在處,以免發(fā)生事故,待該段模板全部拆除后,才可以將模板、配件、支架等運出碼堆。拆下的混凝土模板、配件等,嚴禁拋扔,需要有人接應傳遞,按指定地點(diǎn)堆放,并做到及時(shí)清理、修理和涂刷好隔離劑,以備使用。自上料攪拌車(chē)
When removing the formwork, the staff shall stand in a safe place to avoid accidents. After all the formwork in this section are removed, the formwork, accessories and supports can be transported out of the stack. The removed concrete formwork and accessories shall not be thrown away. They shall be received and delivered by someone, stacked at the designated place, and cleaned, repaired and painted with isolation agent in time for use. Self loading mixer
上一篇:小型混凝土攪拌車(chē)閥體維修要注意什么?
下一篇: 混凝土攪拌車(chē)如何對于干濕料進(jìn)行攪拌?
tag:混凝土攪拌車(chē),小型混凝土攪拌車(chē),全自動(dòng)混凝土攪拌車(chē)

商混攪拌站混凝土配合比怎么調整?

作者:中科聚峰混凝土攪拌車(chē)廠(chǎng)家 時(shí)間:2021-10-22

當商混攪拌站新拌混凝土有泌水現象時(shí),應及時(shí)進(jìn)行查明原因,如果不是外加劑和膠凝材料的適應性的問(wèn)題時(shí),可以調整粗骨料的摻配比例,將級配調整到級配,切不能套用固定摻配比例.
In case of bleeding of fresh concrete in commercial concrete mixing plant, the cause shall be found out in time. If it is not the adaptability of admixtures and cementitious materials, the mixing proportion of coarse aggregate can be adjusted to the best gradation, and the fixed mixing proportion must not be applied
現場(chǎng)坍落度超出配合比設計坍落度的限制時(shí),要及時(shí)分析原因,對砂石料含水率重新進(jìn)行測定,對配合比進(jìn)行校正,如果含水量實(shí)測、計算沒(méi)有錯誤時(shí),可以將減水劑摻量增加或減少0.05~0.1%進(jìn)行調整.
When the site slump exceeds the limit of the designed slump of the mix proportion, the reason shall be analyzed in time, the water content of sand and gravel shall be measured again, and the mix proportion shall be corrected. If there is no error in the measured and calculated water content, the dosage of water reducer can be increased or reduced by 0.05 ~ 0.1%
當商混攪拌站生產(chǎn)混凝土的砂率偏大或偏小時(shí),應及時(shí)進(jìn)行查明原因,將砂率進(jìn)行適當調整,調整比例為±1%如果用上述方法并不能商混攪拌站生產(chǎn)出的混凝土的問(wèn)題時(shí),應當立即停止生產(chǎn)混凝土,并尋找的維修人員進(jìn)行維修,及時(shí)采取有效措施,避免出現其他質(zhì)量問(wèn)題.
全自動(dòng)混凝土攪拌車(chē)
When the sand rate of concrete produced by commercial mixing plant is too large or too small, the reason shall be found out in time, and the sand rate shall be properly adjusted to ± 1%. If the above methods can not solve the problem of concrete produced by commercial mixing plant, the production of concrete shall be stopped immediately, professional maintenance personnel shall be found for maintenance, and effective measures shall be taken in time, Avoid other quality problems
凝土的模板拆除順序一般是先非承重模板,然后承重模板;先側板,后底板。遵循行支后拆,先拆非承重部位,后拆承重部位以及自上而下的原則,拆模時(shí),嚴禁用大錘和撬棍硬砸硬撬。
The removal sequence of concrete formwork is generally non load-bearing formwork first, and then load-bearing formwork; First the side plate and then the bottom plate. Follow the principle of removing after supporting, removing non load-bearing parts first, and then removing load-bearing parts from top to bottom. During formwork removal, it is strictly prohibited to smash and pry with sledgehammer and crowbar.
拆模時(shí),工作人員應站在處,以免發(fā)生事故,待該段模板全部拆除后,才可以將模板、配件、支架等運出碼堆。拆下的混凝土模板、配件等,嚴禁拋扔,需要有人接應傳遞,按指定地點(diǎn)堆放,并做到及時(shí)清理、修理和涂刷好隔離劑,以備使用。自上料攪拌車(chē)
When removing the formwork, the staff shall stand in a safe place to avoid accidents. After all the formwork in this section are removed, the formwork, accessories and supports can be transported out of the stack. The removed concrete formwork and accessories shall not be thrown away. They shall be received and delivered by someone, stacked at the designated place, and cleaned, repaired and painted with isolation agent in time for use. Self loading mixer

截屏,微信識別二維碼